Finished Basement

MKTG_Line No Background.png

JPS performed both the design and construction for the renovation of this basement. The project to finish the basement included the design of a new bar, bathroom, built-in bunkbeds, and a wood stove. Part of the design process was to select a material palette with the client, which was then applied to multiple elements of the design.