New Construction In-Law Suite

MKTG_Line No Background.png

This project included a large-scale addition to an existing home, as well as moving the existing garage. The addition required a significant amount of excavation and foundation work in preparation for the framing of the structure. A second phase of construction to build a roof deck was completed some time after the addition was finished. The roof deck included a cable railing with a wood handrail.